The loading crane is used on the basis for loading links to the supply composition. On the basis of the links are usually collected on both sides of the working path of 3-4 tiers (link) in height. In accordance with this, the loading crane has special equipment, with which the links can be laid on the crane platform on the side.
Platov system loading tap device. The basis of the crane is the same four -axle railway platform as in the styling tap. Under the platform frame, two power plants 8 and the generator 9 are placed, the purpose and device of which is the same as in the styling crane. The rest of the tap equipment is placed on top of the platform, namely: two portal archs 7 are mounted above the buffer bars, they have a beam lattice farm 2 with two rotary arrows 3 and the booth of the upper control of the control.