The beginning of any repair is the preparation and approval of the planning decision. At the end of the approval of the design project, the contractor, as a rule, makes up the estimate in black material, after which he provides it with the customer. The main requirement for the estimate is that it should be maximally detailed both for the ongoing work and on the materials used.
If you carry out repairs yourself, it is still better to compose an estimate of materials in order to at least approximately predict your expenses. For the period of repair it would be an ideal option to move out of the apartment, collecting all your things. Thus, you can safely live in an apartment where there is no plaster dust where plumbing is not dismantled, while your things will also remain in good condition. At the same time, the terms of repair work are significantly reduced, because without the presence of residents, repair work is used much faster.
Repair in the so -called old apartments begins, as a rule, with the dismantling and broken of the «ancient» partitions and walls, with the removal of the ceiling and walls. This stage is considered one of the most «dirty» stages. Many old apartments can «boast» flooring in good condition. In order not to damage it, it will be better to cover it with a film. At the first stages of repair work, window blocks, arrangement of window slopes, window sills are also being replaced.
Wiring wiring is the next stage, while the wiring is usually carried out in the walls, or on the floor. In order to increase electrical safety, increase the reliability of the wiring, it is usually laid inside metal pipes. At the end of the wiring, it is necessary to control the voltage at all points.
The next stage for laying the wiring is painting. This kind of work takes a lot of time, so they usually try to spend it in all rooms in parallel. Repair in the kitchen and bathroom usually begins in parallel with painting work.
Floor screed, installation of doorbells and doors, pasting wallpaper — these are the final stages of repair work. After that, only the installation of skirting boards, decorative elements, switches and sockets, cornices, hanging doors and platbands, etc. D.
This sequence of construction work is not a strict rule, and it is given only in general terms.