Crane equipment of the arrow consists of a cart, a cargo and a traction winch with electric motors. Winches are installed at the back end of the arrow. The device of winches and a crane trolley is similar to the equipment of the laundry crane; The same analogy is available in cable schemes.
Verkhnaya Lost Last Light Cranes.
The process of loading links. For lifting, the link is captured in two places in length with load -grinding devices in the first link is loaded onto the platform in the upturned rails down), so that on the platform this link is based on the rails of the conveyor. The rest of the links load in the normal position. The total number of links in the package 9-10 pcs. After loading, the package is moved along the roller conveyor along the tap on the attached platforms of the supply composition, which are also equipped with a roller conveyor. From the crane to the platforms, the package of links is usually moved by a motor vehicle (one or two); For this purpose, a cable is used with a length sufficient to block all attached platforms. The cable is attached at one end to the hook of the motor carrier, and the other to the package.